On-Site Photos

We have been taking a lot of pictures of the construction.  More will get added over time.

See a time-lapse video of March 12, 2004 (2.7 MB AVI format)

Other Images (click on them to see larger images)


August 15, 2005 - Wave Pool

August 15, 2005 - Tot Pool

June 15, 2005 - Lobby Atrium

July 4, 2005 - Waterslide Tower

June 9, 2005 - Sports Lounge

June 13, 2005 - West Exterior stucco

June 9, 2005 - Lazy River formwork

June 9, 2005 - Leisure Pool tile

March 30, 2005 - Flexihall trade show setup

May 30, 2005 - Flexihall curtain

April 4, 2005 - Curling Club kitchen

May 2, 2005 - Lobby floor waxed

May 11, 2005 - Leisure Pool

May 12, 2005 - Leisure Pool

May 24, 2005 - Lazy River

May 25, 2005 - Change Room tile

March 30, 2005 - Lobby

March 30, 2005 - Pool steel

March 30, 2005 - Convention Centre South wall

March 11, 2005 - Convention Centre dance floor

March 11, 2005 - Leisure Pool from South

March 11, 2005 - Curling Lounge

March 1, 2005 - Flexihall bleacher seating

February 14, 2005 - Flexihall with games in progress

December 21, 2004 - Flexihall floor

December 21, 2004 - Centre court flexihall

November 8, 2004 - Harvest Showdown setup in the flexihall

November 8, 2004 - Curling rink lounge windows (before)

November 12, 2004 - Harvest Showdown in the flexihall

November 19, 2004 - Curling rink lounge windows (after)

November 16, 2004 - Leisure pool rebar

November 16, 2004 - Leisure pool rebar 2

September 7, 2004 - Flexihall bleacher concrete stair

September 3, 2004 - Leisure pool aerial view

Sept 2, 2004 - Ramp demolition

August 25, 2004 - Leisure pool plumbing

July 8, 2004 - Flexihall interior East wall

June 25, 2004 - Arena roof

Please read the Terms of Use
Comments, Questions, Ideas
Copyright © 2017 City of Yorkton. All Rights Reserved.