Spring Runoff and Flooding
Annual cleaning and inspection of Yorkton's storm drains and catch-basins happen as soon as conditions allow. You can report a storm drain issue online, or call the Public Works department at 306-786-1760.
Spring melt |
A sharp increase in temperature during the spring can cause ice packs to melt rapidly, creating the potential for localized flooding. Flooding can impact properties, cause creeks to flood outside their banks and overwhelm city catch basins. City crews make sure major drainage systems are working properly in your neighborhood. As snow melts, we will:
How you can helpWe all have a role to play when it comes to managing stormwater. Ways you can help us reduce the amount of runoff that flows over hard surfaces - as well as the amount of pollution entering our stormwater system include:
If you pump rain or meltwater from your property, please be careful not to overload the drainage system on the street. |
Sump pumps
You should check to make sure your sump pump is working. If you don't have a sump pump, consider installing one. Contact a plumber for help if you need it.
Sewer backwater valve
If you don't have a mainline sewer backwater valve, consider installing one to protect against sewer backup. If you have one, be sure you check it regularly to make sure that it is in good working order.
Helpful Links
Emergencies happen when we don't expect them. Create an emergency plan so you can be prepared and stay safe during an emergency.
Saskatchewan Government Insurance |
Overland Flood Insurance and the Provincial Disaster Assistance Program |
Saskatchewan Water Security |
Runoff projections based on the most recent forecast |
Saskatchewan Ministry of Health |
SaskPower |
SaskPower's tips on what to do before, during and after a flood to protect your family and property. |
General watershed information |
Lake & Stream levels on various points throughout Saskatchewan Assiniboine Watershed Stewardship Association General Information |
Storm sewer facts
Here are some facts about our storm sewer system:
- The storm network is 53 km in length
- We inspect sections of the storm sewer system each year to determine their condition and make repairs based on budget
- Catch-basin repair is an ongoing annual procedure
- We budget for replacements of 10 catch basins annually
- We have a total of 1000 catch basins