Snow Plowing – 2nd Priority Streets, Starting Jan 11, 2024 at 11 P.M.

2-PRIORITY-STREETS-MAP-SNOW-REMOVAL

Roadway crews will be clearing the 2nd Priority Streets beginning today, Thursday, January 11, 2024. at 11 P.M.

Crews will also be clearing downtown back lanes.

If possible, please remove any vehicles from the designated streets during this time.

This has been triggered because there is 2” (5 cm) of accumulated snow on the street.

As the snow is being cleared, sanding and salting operations will follow.

  • If it is below (-20°C) salting will be spread on the designated areas to ensure safety.
  • If it is above (-20°C), sanding will be spread on the designated areas to ensure safety.